LEADER |
00780nam a2200181 a 4500 |
001 |
0045275 |
003 |
Th-MUT |
008 |
181106s9999 xx 000 0 eng d |
020 |
|
|
|a 0727733737
|
040 |
|
|
|a DLC
|c MUT
|
050 |
0 |
0 |
|a R TA145
|b N447 2005
|
245 |
1 |
0 |
|a NEC3 engineering and construction short contract : guidance notes and flow charts (June 2005)
|
250 |
|
|
|a 2nd ed.
|
260 |
|
|
|a London :
|b Thomas Telford,
|c 2005
|
300 |
|
|
|a 86 p. :
|c 30 cm.
|
500 |
|
|
|a Price 22,185 baht/set (มี 23 เล่ม), Includes index.
|
650 |
|
0 |
|a Civil engineering.
|
991 |
|
|
|a MONOGRAPHS
|b 5
|c 2018-11-07 05:33:44
|d 2022-11-06 13:03:15
|e mut
|f n
|g 2018-11-07
|h n
|i a
|j m
|k
|l a
|m
|n a
|o
|p b
|q
|r enk
|s eng
|t 2005
|u 2nd ed.
|v NEC3 engineering and construction short contract : guidance notes and flow charts (June 2005) /
|